Platform launch · 15 Jan 2027

Heavy materials. Moved like clockwork.

Ironhaul is opening a single platform for bulk cement, rebar and structural steel — retail or wholesale, by the bag or by the trailer — backed by our own heavy-haul fleet and depots nationwide.

Doors open in

000Days
00Hours
00Min
00Sec
Build-out started0%Launch

Early access · Price alerts

Lock in launch-week pricing

Be first through the gate. We'll send opening inventory, tonnage pricing and freight lanes before the public launch.

I'm buying as
Alert me on

  • No spamLaunch news only
  • TonnagePrice alerts
  • 1-clickUnsubscribe
  • Portland cement · Type I/II
  • ◆
  • Grade 60 deformed rebar · #3–#11
  • ◆
  • W-beams · ASTM A992
  • ◆
  • Bulk pneumatic tankers · 25 t
  • ◆
  • HSS tube · A500 Gr. C
  • ◆
  • Welded wire mesh
  • ◆
  • Flatbed & step-deck freight
  • ◆
  • Channel & angle · A36
  • ◆

01 — What we move

Three core lines. Zero guesswork.

Mill-certified stock, live inventory by depot, and transparent pricing that scales from a single pallet to a standing monthly contract.

CEM-01

Bulk Cement

Bagged, bulk-bag and pneumatic tanker delivery of Portland and blended cements for batch plants and job sites.

Formats
40 kg · 1.5 t · 25 t
Grades
Type I/II · III · IL
Lead time
24–72 h

RBR-02

Rebar & Mesh

Deformed bar in stock lengths or cut-and-bent to schedule, plus welded wire mesh and accessories.

Sizes
#3 – #11
Grade
ASTM A615 Gr. 60
Fabrication
Cut & bend

STL-03

Structural Steel

Wide-flange beams, HSS, channel, angle and plate — sourced from certified mills and shipped on flatbed.

Profiles
W · HSS · C · L · PL
Spec
A992 · A500 · A36
Lengths
Up to 18 m

02 — How it gets there

Our own fleet.
Our own lanes.

Regional depots linked by a dedicated heavy-haul network. Every order is routed to the nearest stocked yard and tracked from loading bay to tailgate.

WEST NORTH CENTRAL HUB SOUTH MIDLANDS GULF EAST PORT
Active lane Planned lane Depot
Regional depots
0
Heavy-haul units
0+
Tonnes / month capacity
0k
Next-day coverage
0%

03 — Road to launch

Loading the network.

  1. Q2 2026 · Complete

    Depots stocked

    Seven regional yards commissioned with opening inventory of cement, rebar and steel sections.

  2. Q3 2026 · Complete

    Fleet onboarded

    Pneumatic tankers, flatbeds and step-decks dispatched on dedicated inter-depot lanes.

  3. Q4 2026 · In progress

    Pricing engine & trade accounts

    Live tonnage pricing, volume tiers and credit-account onboarding for wholesale buyers.

  4. 15 Jan 2027 · Launch

    Platform goes live

    Online ordering, delivery-slot booking and real-time freight tracking open to every buyer.

Limited launch allocation

First loads ship to the first list.

Early-access buyers get priority delivery slots and launch-week tonnage pricing.

Join the early-access list